7/22/2014 - Roof all done.

Grover and his crew showed up as promised at 8 this morning. Grover and I got on the scissor lift to double check some measurements while the crew staged screws and insulation. Once up on the roof these guys just kept a steady pace. By the end of the day they had installed 80 feet of roofing with ridge caps. Having an experienced crew and all the right tools really helps to move things along.

Hopefully tomorrow I'll have the front of the building on, straight and level. We'll see. At least I now have an enclosed garage and can work on electric and getting the bathroom built and plumbed. I can also move the stuff in storage from Mom's house over after we clean up a little.

Click to see big picture (650x433 pixels; 43 KB)

Click to see big picture (650x433 pixels; 48 KB)

Click to see big picture (650x433 pixels; 37 KB)

Click to see big picture (650x433 pixels; 40 KB)

Click to see big picture (650x433 pixels; 47 KB)

Click to see big picture (650x433 pixels; 30 KB)

Click to see big picture (650x433 pixels; 26 KB)

Click to see big picture (650x433 pixels; 26 KB)

Click to see big picture (650x433 pixels; 39 KB)

Click to see big picture (650x433 pixels; 40 KB)

Click to see big picture (650x433 pixels; 44 KB)

Click to see big picture (650x433 pixels; 52 KB)

Click to see big picture (650x433 pixels; 52 KB)

Click to see big picture (650x433 pixels; 36 KB)

Click to see big picture (650x433 pixels; 54 KB)

Click to see big picture (650x433 pixels; 61 KB)

Click to see big picture (650x433 pixels; 54 KB)

Click to see big picture (650x433 pixels; 50 KB)

Click to see big picture (650x433 pixels; 52 KB)

Click to see big picture (650x433 pixels; 60 KB)

Click to see big picture (650x433 pixels; 44 KB)

Click to see big picture (650x433 pixels; 23 KB)

Click to see big picture (650x433 pixels; 22 KB)

Click to see big picture (650x433 pixels; 27 KB)


Copyright (C) 2004-2014, Larry Manka. all rights reserved.