7/10/2014 - Finished with front wall.

There were only three of us today. Brandon had a commitment for some fence work and borrowed Audifaz to help out. Leroy, Alston and I set to work measuring and cutting the panels to finish the front wall. The first 4 panels were short to go over the garage door. The panel that went around the left side of the door was a pain to install. The bottom has to be captured by the floor trim at the same time the panel has to fit behind the door trim and go over the top door trim. It also has to fit under the top angle and you can't start back because of the roof rake. We managed to get it in by bending the door trim a bit to get the panel behind it. It springs back into place once the panel is set.

It was suppose to rain today, but instead it was just hot and muggy. Tomorrow we'll start installing trim and figuring out what has to be installed before we start the roofing.

Click to see big picture (650x433 pixels; 50 KB)

Click to see big picture (650x433 pixels; 49 KB)

Click to see big picture (650x433 pixels; 20 KB)

Click to see big picture (650x433 pixels; 38 KB)

Click to see big picture (650x433 pixels; 33 KB)

Click to see big picture (650x433 pixels; 58 KB)


Copyright (C) 2004-2014, Larry Manka. all rights reserved.