9/16/2014 - New Hand Rails for front steps.

Brandon and Leroy came by today and we built hand rails for the new front steps. Because we changed the pitch of the new steps we couldn't use the old rails at all. The angle was different and the old wood was kiln dried junk.

We use all pressure treated and made sure the posts were deep enough to be really sturdy once we concreted them in. I'll let the wood dry out for a few days before I stain them to match the rest of the rails.

Click to see big picture (650x433 pixels; 76 KB)

Click to see big picture (650x433 pixels; 62 KB)

Click to see big picture (650x433 pixels; 74 KB)


Copyright (C) 2004-2014, Larry Manka. all rights reserved.